- new paper machines (”turnkey deliveries”) up to the wire width of 6.000 mm and with an operational speed up to 1.000 m/min (products: fluting, liner, graphic papers, decorative papers, tissue)
- new and complete stock preparation lines
- up to 750 tons per day - waste paper (fluting, liner, tissue)
- up to 250 tons per day - cellulose (tissue, graphic papers)
- machines and equipment for paper machines and stock preparation lines
- PM and SPL reconstructions
- pressure and non-pressure cylinders up to a diameter of 1.550 mm and a length of 8.000 mm
- special processes (plasmasprays, non-metallic coatings application, rolls grinding, balancing – elastic slots included, blasting, surface finishing by coating, superfinishing)
- project management (planning, budgets, costs controlling: cash-flow controlling, investment execution)
- projecting (technical calculations of the processes, flow sheets, project documentation provision, machine layouts, foundations flow sheets and piping flow sheets, measurement and regulation philosophy)
- procurement of supplies (demand management, offers evaluation, cooperating at deciding about the orders and at purchase contract compiling, logistics provision, organization of assembly and assembling supervision, commissioning, guarantee tests)
- construction works management (coordination of tenders, construction supervision, process and quality control during construction works)
Financial consultancy
- processing of feasibility study - evaluation of the current investment, creating a business plan for a new investment plan, assessment of the project profitability, calculation of costs and consumption of energy inputs - water, gas, steam, etc., calculation of the total economic return on investment
- creation of complete documentation to provide export credit or other form of project financing - credit application, assessment of the project impact on the environment, communication with banks or insurance agency
Engineering
1. basic engineering
- detailed technology description, including a technological scheme of the process production
- process and provision of related technical documentation of machines and equipment
- coordination of the project preparation phase
- final approval of the machines and equipment layouts
2. detailed engineering
- processing of complete project documentation - machine-technological, electric, measurement and regulation documentation, processing of machinery project for construction works management
- project management - provision and organization of machinery supplies, coordination with suppliers of building projects, creation and controlling of project implementation schedule
3. realization engineering
- organization of assembly, assembly supervision, chief assembly, commissioning and guarantee tests