Year:
2005
Category:
Machines for stock preparation line
Customer:
NOVAGOLD INVESTMENTS LIMITED LTD (SANTANA), Gorlovka
Country:
Ukraine
Product description
Delivery of equipment:
Term of commissioning: March 2005.
- cleaner VS-20-M (1 pc)
- washing separator VSV-20 (1 pc)
- SH refiner D-20-D (1 pc)
- station of cleaners VU-25-M (3 pcs)
- pressure screen STU-081 (1 pc)
- 7 pumps; measurement and control instruments
- control panel for the entire line (except of pulper)
Term of commissioning: March 2005.