News

8. 9. 2010
You are cordially invited to visit us in the largest annual meeting for the Middle East & Africa paper industry, Paper Middle East Exhibition 2010 in Cairo (Egypt), September 18 - 20, 2010. Find us in Hall 4, Booth E 67.
7. 4. 2010
At the end of 2009, the PAPCEL Co. concluded a contract with a Russian paper mill. Ussuriysk, the hometown of the paper mill, is located in Far East, on the coast of the Pacific Ocean not far away from border with China.
1. 4. 2010
In recent months, the PAPCEL Co. reconstructed a PM 1 press part in Mondi Ružomberok. The aim of the project was to improve the mechanical qualities of paper and to increase work safety and efficiency of paper web threading at the machine start-up or paper break
Archive file of news
Home Products and Services Stock Preparation Questionnaires for offer Questionnaire of offer processing for PSN

Questionnaire of offer processing for PSN

Customer:
Address:
Customer contact person:
E-mail:
Phone:
+
Reference to PM No.:

Parameters

Capacity (required):
tpd
Initial raw material:
Consistency in pulper:
%
Paper assortment to be produced, substance, web width (trimmed) etc.:
Required material:
Requirements on automatics of pulping process:
PSN control to be linked to:

Complete only in case, if you use this questionnaire only for information on machine flow rates and performance characteristics:
(e.g. in case, if you use this questionnaire only for information on characteristics of preliminary machine to be linked to another machine to be ordered)

Date of measurement:

Periodical rejects separator PSN

Type PSN:
Actual capacity (currently):
tpd
Data of motor type plate:
Capacity: kW
Speed: rpm
Power factor cosφ:
Efficiency:
Rated current: A
Rated voltage: U
Belt gearing:
Motor belt pulley diameter: mm
Machine belt pulley diameter: mm
Belt type:
Friction clutch between machine belt pulley and shaft:
Actual current consumption – mean consumption:
A
Actual current consumption – peak consumption:
A
Rotor blades - material:
Date of first blades utilisation, their condition:
Date of first blades utilisation:
Blades condition:
Set-up intervals for play between blades and sorting screen:
Sorting screen:

øD: mm
Date of first sorting screen utilisation:
Sorting screen condition:
Working chamber:
Inspection intervals of chamber:
Cleaning intervals of chamber:
Setup of automatics:
Water filling period: second
Running with stock: second
Stock deflaking period: second
Washing of rejects: second
Discharging period: second
Diluting water consumption:
l/min
Volumes of rejects:
l
Rejects consistency:
%
How often do you replace worn parts:
Working blade:
Outlet blade:
Sorting screen:
Other parts:
How often do you adjust/clean this machine (screen):
Additional information:
Attach file:

Bold shown items must be filled in!

Log-in in user zone

User name: Password:

The business activities are primarily focused on the following regions: 

Belarus, Bulgaria, the Czech Republic, Egypt, Hungary, Kazakhstan, Latvia, Lithuania, Poland, Rumania, Russia, Serbia, the Slovak Republic, Slovenia, Turkey, the Ukraine


PS works